QTac

Guides

Step by step, with pictures of QTac doing the work.

Checking a quantity before it goes into a bid

The four checks that catch nearly every take-off error: scale, outliers, the working column and the marked-up PDF.

14 Oct 2026

Your first take-off, step by step

Open a drawing, set the scale, measure a slab and a wall, and export the dimension sheet. About fifteen minutes.

14 Oct 2026

Deducting openings without double counting

Mark a door once and QTac takes it out of plaster both faces, brickwork and painting. Here is how, and what the Assumptions sheet records.

14 Oct 2026